In this case, since these are two tertiary packaging each managed in its own destination flow, each must have its own identification code for the material as per decision 129/97 / EC.
Last modified on 19/11/2021
In this case, since these are two tertiary packaging each managed in its own destination flow, each must have its own identification code for the material as per decision 129/97 / EC.
Last modified on 19/11/2021